Efficient Progress and Rhythm Control
Efficiency ImprovementResource PlanningRhythm Control
Without promising specific timings, offers a safer acceleration framework: economic rolling, advancing key points, and wave prediction.

Acceleration framework:
- Economic rolling: maintain investment–return positive feedback, avoid cashflow breaks;
- Advance key points: complete core spots and control systems before high pressure;
- Wave prediction: observe–probe–reinforce loop, build before pressure arrives as much as possible.
Practice essentials:
- Before each wave, ask: which single upgrade now most increases survival chance?
- Keep a small flexible budget for emergencies;
- Do not chase "extreme times"—prioritize stability.